SPC floor is a luxury rigid core spc flooring. Its substrate material consists of a composite board made of stone powder and thermoplastic polymer material after mixing evenly. At the same time, it has the performance and characteristics of wood and plastic to ensure the strength and toughness of the floor.


With the rise of environmental protection, more and more families have chosen environmental protection materials to be used as flooring. Before the floor installation, the spc rigid core waterproof flooring needs to be cut into shapes of different specifications. Fixed, pushing through human hands, not only affects the efficiency of work, but also easily causes deviation in the cut direction, which is not conducive to the cutting of the floor.


In order to install faster and more convenient, we can use floor cutting machine and curve saw SPC floor to provide beautiful and clean cutting cables,ensure saw blades are sharp and suitable for cutting SPC materials. This spc flooring for outdoor is cut with a general inlaid alloy saw blade. The use of a saw blade is shorter, and the smoothness of the high -speed steel saw tablet is insufficient. It is recommended to use tungsten steel saw blades or cold saws.


After cutting, gently sand the cut with sandpaper or a file to remove any possible burrs and ensure a smooth cut.


Commercial spc vinyl flooring installation


1. Formal pavement


Environment confirmation:

Confirm that the ground is flat, and there is no interior decoration engineering cross -construction; the continuous paving width direction must not exceed 6 meters, and the length direction does not exceed 8 meters.


Confirmation method:

369 paving method/paving method, also known as "workplace shop method"/random paving method.


Confirmation direction:

To determine the laying direction of the floor, it is recommended to lay the floor in the direction of the light, that is, the paving direction is perpendicular to the window. The advantage of this is that the floor extends forward with the direction of the sun, strengthening the depth of the space, and it will be more visually open.


2. Floor paving


Follow-up steps:


① Put the moisture -proof membrane (ground membrane): first spread the ground membrane above 2.0mm, do not overlap between alignment between the membrane and the membrane. The side of the wall must be quoted by more than 50mm.


If it is used for geothermal ground, first floor, and large shopping malls, a 0.6 mm thick film should be added under the ground membrane, and each two thin film seams should be overlapped 200 mm, and the rubber strips are seal strictly. About 2 cm for folding against the wall.


② Formally laying:

1) Pre-shop: Disassemble the floor before installation, place it according to different textures, and try the laying effect. (Select the floor with a messy floor pattern or a large color difference, laying it on the bottom of the bed or an inconspicuous part);


2) Try to install the first row of floors from the side of the door of the room. To prevent the natural expansion of the floor, 4-10mm telescope joint should be reserved between the wall and the floor. Add a special pad (after paving, you should take it out).


3) Installing the floor method: "First grow first and then short, press the first, then push it": first push the public slot into the parent slot, push the floor long side from the outside to the inside, and insert it into it; then completely press the short -edged public slot completely Enter the mother tank, and push it inward with the same method.


4) Note that during the installation process, when the first row of the first row is installed, the remaining part of the floor is needed first, and the floor needs to be measured in turn. The alien treatment of the door frame must be carefully and careful, first mark and then cut.


5) When installing the second row of the floor, insert the short -border convex tenon into the groove of the front row of the front row, and gently insert the long -side convex tenon into the corresponding floor groove.


6) You can use a rubber hammer to assist the pavement when there is a gap.


7) On average, four rows of installation are installed on average to ensure that the installation is not different;


8) When installing the last row of edge, whether to use the material head stitching or the whole plate tailoring, it should be solicited for the advantages and disadvantages of the two methods; after the installation, you must go back and forth. There is no abnormality in the suspension.


9) After the engineered spc flooring is paved, there is no abnormality, and the special pads at the reserved telescopic joint will be removed.


10) Install the skirting line: The skirting line should be pressed to the surrounding film margin and draw the surplus film with a blade. When installing the skirting line, the yin and yang horns must be made and there must be no falling phenomenon. , The gap between the screws of the footboard ≤1.0 mm, the height difference between the jet interface ≤1.0 mm; when installing solid wood kick skirting, the drilling height on the wall should be consistent (500 mm distance). Eyes must be made up with the same color putty to make it beautiful and flat.


11) Installation buckle: First of all, you need to confirm the installation position of the buckle and measure the size of the fastener. The installation requirements of the buckle are vertical and the screws are tightly tightened. The buckle must not have no sound, the bonding is firm and guaranteed to be beautiful.